Coping with uncertainties for improved modelling and decision making in nuclear emergencies. Key results of the CONFIDENCE European research project
|
|
---|---|---|
Page(s) | S17 - S37 | |
Section | COPING WITH UNCERTAINTIES FOR IMPROVED MODELLING AND DECISION MAKING IN NUCLEAR EMERGENCIES | |
DOI | https://doi.org/10.1051/radiopro/2020009 | |
Published online | 26 June 2020 |
Article
CONFIDENCE dissemination meeting: Summary on the scenario-based workshop
1
VUJE – VUJE, a.s.,
Trnava, Slovak Republic
2
PHE – Public Health England, Centre for Radiation, Chemical and Environmental Hazards,
Didcot, UK
3
CEH – UK Centre for Ecology & Hydrology,
Lancaster, UK
4
BfS − Federal Office for Radiation Protection,
Neuherberg, Germany
5
KNMI – Royal Netherlands Meteorological Institute,
Utrechtseweg, The Netherlands
6
HMGU – Helmholtz Zentrum München–German Research Center for Environmental Health,
Neuherberg, Germany
7
IRSN – Institute for Radioprotection and Nuclear Safety,
Fontenay-aux-Roses, France
8
Met Office,
Exeter, UK
9
CIEMAT – Centro de Investigaciones Energéticas, Medioambientales y Tecnológicas,
Madrid, Spain
10
KIT – Karlsruhe Institute of Technology,
Eggenstein-Leopoldshafen, Germany
11
NMBU/CERAD − Norwegian University of Life Sciences, Centre for Environmental Radioactivity,
Ås, Norway
12
SCK-CEN − Belgian Nuclear Research Centre,
Mol, Belgium
13
RIVM – National Institute for Public Health and the Environment,
Bilthoven, The Netherlands
14
UZ – University of Zürich, Department of Physics, Science Faculty,
Zürich, Switzerland
* Corresponding author: tatiana.duranova@vuje.sk
The CONFIDENCE dissemination workshop “Coping with uncertainties for improved modelling and decision making in nuclear emergencies” was held in December 2–5, 2019 (Bratislava, Slovak Republic). About 90 scientists and decision makers attended the workshop. The dissemination workshop allowed the presentation of the CONFIDENCE project results, demonstration of the applicability of the developed methods and tools in interactive discussion sessions and the collection of feedback from the participants. The results were disseminated not only in the form of presentations and posters but also through interactive workshops where all participants were involved in round table working groups. A fictive accidental release scenario taking place at a nuclear power plant was developed and used by each work package in the workshop to provide the basis for interactive sessions and discussions.
Key words: dissemination of results / interactive scenario-based workshop / uncertainties / decision support / CONFIDENCE
© The Authors, published by EDP Sciences 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (https://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
1 Introduction
The CONFIDENCE Project, funded under the H2020 EJP CONCERT (European Joined Project), performed research focused on uncertainties in the area of emergency management and long-term rehabilitation. It concentrated on the early and transition phases of an emergency, but also considered longer-term decisions made during these phases. The project brought together expertise from four European Radiation Protection Research Platforms (NERIS, MELODI, ALLIANCE and EURADOS) and also from SHARE (Social Sciences and Humanities network). The CONFIDENCE Final Dissemination workshop “Coping with uncertainties for improved modelling and decision making in nuclear emergencies” was held in December 2019 (Bratislava, Slovak Republic). About 90 scientists and decision makers attended the workshop.
The objectives of this final workshop were as follows:
-
to disseminate the knowledge acquired and to demonstrate the capability of the developed models, methods, approaches, guidance, recommendations and tools;
-
to collect feedback from end users on outputs and remaining research requirements, or improvements, in models or guides; this feedback may be used by the Radiation Protection Research Platforms to further develop their Strategic Research Agendas and Joint roadmap.
The workshop was designed to be of value to the different actors in emergency and recovery preparedness and management: decision makers, advisors, researchers and stakeholders (professional and students including early career researchers) at various levels (international, national, regional, local) that may play a role within the decision making process during the post-release and transition phases of a nuclear/radiological accident.
The complexity of the areas of research as well as a variety of tools and methods developed under the CONFIDENCE project provided an opportunity to perform the dissemination of the results in an interactive way. The workshop comprised presentations, panels, poster sessions and scenario-based facilitated group discussions. Each work package (WP) of the CONFIDENCE project dealt with different stages of the decision making process. The WP used various tools and methods, including simulation, measurements, surveys and panels. The workshop program alternated between WP presentations and interactive discussions using the same scenario as a common thread (described in Sect. 2), but oriented toward issues and outputs specific to each WP (presented in Sect. 3). The programme followed the stages of a decision making process in case of an accidental release of radioactive material.
2 Using a scenario as a key method of communication CONFIDENCE outputs
To facilitate the workshop a scenario-based on a (fictitious) large nuclear accident at the Borssele power plant in the Netherlands (Fig. 1) was developed; extensive territories in this country and in the neighbouring Belgium were affected by the resultant plume. It was based on the hypothetical accident scenario used by WP1 for uncertainty propagation, the so-called Radiological Ensemble Modelling (REM) case study, with the short release scenario (Korsakissok et al., 2020).
All presentations and the facilitated discussions and group work used the scenario as a common thread, demonstrating CONFIDENCEs outputs and prompting discussion.
Fig. 1 Location of the hypothetical scenario. |
2.1 Release scenario
The source term originally designed and used by WP1 for the REM case study was scaled to a 900 MWe reactor (instead of 485 MWe at Borssele). For the purpose of demonstration, the source term was artificially multiplied by a further factor of 5 in order to have large consequences, for instance in terms of population or surface above a given dose threshold. This increase led to an accidental release of 800 PBq I-131 equivalent, comparable to the Fukushima release (Fig. 2).The radionuclides considered were: 90Sr, 131I, 132I, 132Te, 133Xe, 137mBa, 134Cs, 136Cs and 137Cs. The release duration was four hours. Uncertainties on the release time were considered to be ±6 hours.
Fig. 2 Source term of the hypothetical scenario and its position on the INES scale (International Nuclear and Radiological Event Scale) compared to the Chernobyl and Fukushima accidents. |
2.2 Meteorological scenario
The meteorological fields were provided by KNMI using the high-resolution HARMONIE-AROME model. An ensemble of 10 meteorological members was constructed by KNMI to represent the meteorological uncertainties (Geertsema et al., 2019). The meteorological scenario (corresponding to WP1 case study REM-2) featured a meteorological variability in the wind direction and precipitation within a few hours during the passage of a warm front (Figs. 3 and 4).
The content of the meteorological fields was “shifted” in time from January to July in order to have a significant impact on food products such as milk (with cows grazing outside in July), cereals or vegetables (Hamburger et al., 2020). This enabled the consideration of agricultural countermeasures.
2.3 Combination of uncertainties in wind direction, precipitation and release time
The uncertainty associated with the release time was ±6 hours, and the potential release period covered the time during which the warm front passage occurred, leading to significant variability in wind speed and direction (Fig. 3).
The wind direction change and precipitation, combined with the uncertainty in the release time, led to large differences in the plume trajectory and subsequent footprint (Fig. 4). The plume travelled northeast when considering a release at 12:00 UTC on day D (12/07/2017 in the interactive scenario) with small to medium amounts of precipitation, whilst it was advected south–southeast if the release occurred later (at 18:00 UTC on day D or 00:00 UTC on day D + 1), with heavy precipitation around 18:00 UTC. This induced large uncertainties in the health consequences and subsequent countermeasures to be taken, which were tackled in the WP1 part of the interactive discussion (Sect. 3.1).
During the workshop, each WP introduced other types of uncertainties related to their specific research and developments, in order to demonstrate the outcomes and facilitate discussions and feedback from the workshop participants.
Fig. 3 Wind speed and direction at the source location, forecast by the ensemble members at 10 m (black) and 250 m (gray) above ground. The x-axis shows the number of hours after beginning of meteorological forecast, “Now” is the time when the decision making takes place during the first stage. The “potential release time” is at 21:00 UTC ±6 hours (dark rectangle). |
Fig. 4 Indicative 6-hour plume trajectories based on analysed weather as a function of height (between 10 m and 500 m), for a release on 12/07/17 at 12:00, 18:00 UTC, and 13/07/17 at 00:00 UTC and rain (cumulated in one hour). Trajectories plotted by KNMI. |
3 Summary of scenario-based demonstrations and feedback
The following sections provide information on the way each CONFIDENCE WP adapted the scenario to their specific issues, and summarises the resulting discussions and feedback from the participants.
3.1 Model improvement in the pre- and release phase, through uncertainty analysis and propagation with an ensemble approach (WP1)
The issues tackled during the interactive discussions led by WP1 were related to the emergency phase. Specifically, the audience was asked to play the role of decision makers in an emergency situation, where decisions have to be made for the protection of the population before the release occurs. The discussion was divided in two stages. In the first stage (stage 1), the audience was advised that possible release was anticipated to take place within 24 hours, with an uncertainty of ±6 hours (Figs. 3 and 5). The second stage (stage 2), 12 hours before the release, updated the scenario with new information on the accidental situation: the release time was now certain (Fig. 9). In the first stage, discussions focused on evacuation and sheltering. During the second stage, decisions made in the first stage were reviewed in light of the updated situation.
The goal of this exercise was to consider how uncertainties intrinsic to an emergency situation could be dealt with during the decision making process. In particular, several maps were presented to the audience in order to present as clearly as possible the different options. One of the feedbacks requested from the participants concerned the maps and outputs that were useful for decision making (Fig. 6).
For both stages, background information and maps were presented to the audience, which was then divided into groups of about 10 people. In stage 1, half of the groups discussed evacuation and the others, sheltering. In stage 2, all groups were to review their decisions taken in the first stage and to discuss food ban. Each round of discussion took 15 minutes, followed by 15 minutes of feedback (each group had to nominate a referee to report the discussions and decisions reached).
Fig. 5 Stage 1 of WP1 discussions. Estimated time to release − 24 hours. Uncertainty in the release time: ±6 hours. |
3.1.1 WP1 scenario-based discussions: stage 1
3.1.1.1 Presentation of the support for discussion
The discussions within the stage 1 focused on sheltering and evacuation of the population and were driven by the questions given in Figure 6.
To inform discussion, several maps were presented to the audience. For a given dose corresponding to a particular protective action (levels given in Fig. 5), a map of “frequency of threshold exceedance” was represented. These maps could be interpreted in terms of likelihood that a given area could be affected by a dose above the given threshold (Fig. 7).
The frequency maps showed the areas that would “most probably” be affected by the accidental release, however, they were not able to provide a view of the plume footprint that may actually occur. To complement this, example maps of particular simulations (that is, possible outcomes) were provided. The focus was on the “least severe” and “worst case” scenarios in terms of population within the area of threshold exceedance. Out of the 50 simulations (called ensemble members) representing different possible situations (and combined into the frequency maps presented in Fig. 7), the “worst case” was corresponded to simulation number 41 and the “least severe” to member 29. Figure 8 shows the maps of effective dose resulting from these two simulations. The map of the “least severe” case presents a plume footprint located southeast of the release location, which corresponds to a release occurring after the wind direction change. The “worst case” map shows an area of threshold exceedance in the north-eastern zone. The former is within the area of higher frequency of threshold exceedance, whilst the latter corresponds to a lower frequency (Fig. 7). In other words, there was a smaller chance that the “worst case” scenario occurs but, if it did, the consequences would be more severe than for more “probable” scenarios.
Fig. 6 Questions asked to the audience during stage 1 of WP1 discussions. |
Fig. 7 Prognostic frequency map for areas above the threshold value for evacuation (left) and sheltering (right), considering an uncertainty in the release time of ±6 hours. The value 0 corresponds to areas where no simulation forecast a threshold exceedance, and 1 (red (black in B&W printed version)) implies that all simulations considered predict a value above the threshold. |
Fig. 8 Maps of effective dose for (a) the “least severe” and (b) the “worst case” scenarios in terms of population affected by the threshold exceedance. The first item in the legend (red colour) corresponds to evacuation and the second item in legend (orange colour) to sheltering criterion. |
3.1.1.2 Feedback from WP1 stage 1 discussion
Evacuation
The main information that participants inferred from the frequency maps (Fig. 7) was the high uncertainty in the direction of travel of the plume. Therefore, the decision to evacuate was assumed to be uniform in all directions (within a given radius) and participants considered only distance from the release (and not direction). Some proposed a radius of 5 km if resources permit.
They expressed a need for information on site plan, location of evacuation shelters, resources, vulnerable people, planning zones (and actions already decided within this zone) and tourist numbers.
Sheltering
Participants used frequency maps and population maps, but had more difficulty reaching a decision. Some proposed to wait for more information (e.g. on the plume direction) before issuing a message, others proposed to recommend “preparation for sheltering”.
They discussed the timing of the message, for instance, to avoid rush hours and panic. They suggested issuing the message to shelter when most people were already at home.
Some separated the information given in the maps into 2 different areas: high probability/low consequence, and low probability/high consequence.
The audience expressed a need for information on cross-border agreements between the neighbouring countries possibly impacted and how to coordinate transboundary messages.
3.1.2 WP1 scenario-based discussions: stage 2
In this second phase of discussions, the estimated time to release was 12 hours and the release date was known to be 12/07/2017 at 15:00 UTC (Fig. 9). The objective was to review the decisions made during stage 1 for sheltering and evacuation (Fig. 10). Additionally, food restrictions were considered (Fig. 11).
No uncertainties remained on the release time. The meteorological uncertainty was still represented by the 10 meteorological members.
This led to a very different prognosis frequency map of threshold exceedance, where the plume footprint was clearly north–northeast of the release location (Fig. 12).
Within stage 2, the questions in relation to evacuation and sheltering were addressed (see Fig. 10), whilst taking into account decisions made previously.
The focus on food restriction was driven by the following questions given in Figure 11.
Fig. 9 Stage 2 of WP1 discussions. Estimated time to release − 12 hours. No uncertainty in the release time. |
Fig. 10 Questions for WP1 discussion for stage 2–evacuation and sheltering. |
Fig. 11 Questions for WP1 discussion for the stage 2–food restriction. |
Fig. 12 Comparison of prognostic frequency maps for areas above the threshold value for evacuation: stage 1 with uncertainty in release time (left) and stage 2 without uncertainty in release time (right). |
3.1.2.1 Feedback from WP1 stage 2 discussion
Review of evacuation and sheltering decisions
When considering the updated information, most groups decided to extend the evacuation on a north-eastern sector based on the frequency map (Fig. 12). They discussed the issue of people trapped between the plume and the coast.
Several groups decided to instruct sheltering across a 50-km zone. Some pointed out that, even if there was a more certain wind direction, the uncertainty (coming from meteorology) shown in the map was still high enough to have an impact on the decision making process.
They discussed the methods of implementing sheltering, with recommendations such as collecting children from schools, provision of access to bottled water and food (not freshly harvested). The conditions for lifting sheltering order were also discussed. For instance, issues about how long people could stay indoors and what should be allowed or not after lifting the order to shelter, were raised.
Food restrictions
During the short time devoted to discussing food restriction, most groups decided to tell people not to eat freshly harvested food in sheltering zones. They also decided that recommendations to feed cattle on stored food and to shelter them should also be issued in sheltering areas. In the evacuation zone, issues about milking cows were raised. In the background materials, some maps featured probable threshold exceedance of food contamination within areas where no sheltering was planned (not shown in this article), which raised a communication issue relating to the formulation of a food ban message without implementing other protective actions.
3.2 Reduction of uncertainty in dose assessment for improving situation awareness and risk estimation (WP2)
The demonstration of tools developed in WP2 focused on health risk assessment and its implications for decision making in the early phase, data assimilation and monitoring strategy and results. All three aspects will be described in the three following subsections.
3.2.1 Health risk assessment in the early phase
The benefit of having a software tool for quick and easy assessment of radiation attributed cancer risk for the general population in the transition phase, based on measured doses can be seen as widely accepted (Walsh et al., 2019, 2020). Therefore, the demonstration focused on the applicability of the same tool for health risk information in the early or threat phase, when doses to population groups are based on prognostic data only, with potentially high uncertainties. For this, the uncertainty in the dose maps for the given scenario was visualized by areas of countermeasures (exceedance of 10 and 100 mSv) for given percentiles of the seven-day effective dose. The percentiles chosen were 10% (largest areas of countermeasures), 50% and 90% (no area of countermeasures). For the three different maps, the number of expected cancer cases, baseline cases and the lifetime fractional risk (Walsh et al., 2019) was then calculated, with uncertainty, taking into account the expected dose reduction by the respective countermeasure. This was done for a few cancer outcomes and three age groups of the general population, in order to limit the amount of information to be displayed and considered. Full details will be given elsewhere (Woda et al., in prep.).
Following the demonstration, the participants of the workshop were asked to discuss in groups the issue of the countermeasures based on dose and health risk information, focussing on, amongst other questions, whether or not they find the health risk information to be useful and if they would recommend decision makers to consider the health risk implications.
3.2.2 Data assimilation
With first monitoring data available, data assimilation can be performed to contribute to better characterisation of the situation and to better support decision making. Especially in the early phase, data from atmospheric dispersion calculations and data from the first and typically sparse radiological measurements can be combined using data assimilation techniques. The data assimilation model used in this work is based on an Ensemble Kalman filter (EnKF). Results of the data assimilation using an EnKF are illustrated in Figure 13. Frequency maps of threshold exceedances for effective dose greater 10 mSv (top panels) and iodine in milk greater 500 Bq/kg are updated using data assimilation; the updated maps on the right hand side of the panel. The updated maps show an increase of frequency, i.e. probability, of threshold exceedance in the affected areas and therefore a reduction of uncertainty in the frequency maps.
Fig. 13 Frequency maps for effective dose >10 mSv (top panels) and iodine in milk >500 Bq/kg (bottom panels), without (left) and with (right) data assimilation. |
3.2.3 Monitoring data and monitoring strategy
As soon as data from stationary and mobile monitoring are available and assessed they are used for further data assimilation and for making more precise decisions based on the improved assessment of the radiological situation.
Combination techniques for prognostic results and monitoring data are needed to reduce uncertainties in decision making process in urgent and early response phase.
The assumed monitoring data also showed local features, which were not predicted by any of the ensemble members. Additional mobile monitoring data are needed to reduce uncertainties for dose assessment for different critical tasks for protecting population in the early response phase of an accidental release scenario:
-
task 1 – Population living in regions, where assessed dose exceeds dose intervention level for relocation. Additional information from mobile dose rate monitoring help to reduce uncertainties in the corresponding decision making process;
-
task 2 – Population living in regions, where assessed dose exceeds dose intervention level for sheltering. Additional information from mobile dose rate monitoring help to reduce uncertainties in the corresponding decision making process (see Fig. 14);
Fig. 14 Updated combination of model results and monitoring data: additional information from mobile dose rate monitoring in indicated area (gray or orange line) needed for decision on sheltering and relocation.
-
task 3 – Population living in regions, where potential hot spots are indicated e.g. due to wet deposition. Additional information from mobile dose rate monitoring help to reduce uncertainties in dose assessment (c.f. Fig. 15).
Fig. 15 Updated combination of model results and monitoring data; additional information from mobile monitoring needed for decision on sheltering in urban hot spot region.
The discussion on monitoring strategies focused of the following points:
-
Which monitoring strategies would you recommend?
-
Will your strategy be based on prognostic or existing observation data?
-
Which areas will be prioritised?
3.2.3.1 Feedback from WP2 scenario-based discussions
Concerning the health risk assessment, there was an unanimous feedback by the participants that this information is generally important but there were reservations of applying this tool in the early phase based on prognostic data only. However, it was suggested that the health risk tool could be very useful for communication to the public and to balance the positive and negative effects of the respective countermeasures. More details are given in Woda et al. (in prep.).
With regard to the monitoring strategy, workshop participants stressed the importance of mobile versions of the detectors and remarked that this should also include unmanned aerial and ground vehicles (drones and robots). The overall opinion was that the monitoring strategy and decision should be based on prognostic data but that the observed data, as soon as they are available, should be used to adjust the recommendations. Monitoring data are also needed to decide if the countermeasures can be lifted. Although measurements should focus on the prioritized areas, monitoring outside these areas was also recommended by the participants to confirm that the level of contamination is truly negligible or zero.
3.3 Radioecological modelling: fit for purpose (WP3)
The outputs of WP3 were reviewed (see Beresford et al., 2020) with the focus being on the development of process-based soil–plant models and their application to the Borsselle scenario.
The demonstration compared predictions of the FDMT (Food Chain and Dose Module for Terrestrial Pathways) module in the JRODOS decision support system to process-based models focusing on predictions for 90Sr and 137Cs in grass and milk. The default parameters of FDMT were used, with the model being implemented in the ECOLEGO platform (see Brown et al., 2019, Brown et al., 2020). The effect of K-fertilisation on radiocaesium transfer to milk and grass was also considered. The area of the scenario used for this demonstration is presented in Figure 16. Figure 17 presents the deposition pattern over the study area and, Figure 18, for demonstration purposes, a fabricated soil distribution map with soil characteristics data. Figure 19 presents a comparison of results using a soil–plant processed-based model for different soil types with predictions using the default FDMT model.
Fig. 16 Area for demonstration of process-based modelling. |
Fig. 17 Deposition map for 90Sr (Bq m−2) used in the assessment. Note: the values are reported as natural logarithm, ln(deposition). Each cell covers an area of 1 km2 (from Brown et al., 2020). |
Fig. 18 Soil property data and soil map showing the grid of spatial soil categorisations (C: clay; SL: sandy loam; SSL: sandy silty loam; LS: loamy sand; O: organic) as used in the assessment (note this has been fabricated for demonstration purposes; from Brown et al., 2020). Cell size equates to 1 km2. |
Fig. 19 Predictions of 137Cs activity concentrations in milk using a process-based soil–plant model for the different soils types; for comparison predictions using FDMT are also given. Top: predictions over 27 years; bottom: predictions over the first 90 d after deposition. Note: an expanded and refined application of the Sr and Cs soil–plant process-based models to the Borsselle scenario is presented and discussed in Brown et al. (2020). |
3.3.1 Feedback from WP3 scenario-based discussions
The scenario-based presentations demonstrated that:
-
process-based soil–plant models could be used for Cs and Sr to identify areas of longer-term comparatively high (or low) transfer and hence better focus remediation effort (Fig. 19, top);
-
process-based models generally offer no appreciable benefit for short-term predictions (as interception etc. dominates and root uptake is minor).
Process-based soil–plant models have some potential to model soil based countermeasures (see Brown et al., 2020); however, more work is required on how to implement (and test) this. Similarly, there is a general need to test, and where required, improve the existing process-based soil–plant models.
A poster was presented at the dissemination meeting describing the findings and conclusions of a workshop, “Do process-based models have a role in human food chain assessments?” (September 2019, Madrid) which was attended by about 40 end-users (industry, regulators, international bodies) and scientists, (see Beresford et al., 2020; Duranova et al., 2020).
3.4 Transition to long-term recovery, involving stakeholders in decision-making processes (WP4)
The fourth block in the workshop was dedicated to addressing the issues and uncertainties arising in the management of the response, and the recovery preparedness carried out by decision-makers, including the stakeholders, during the transition phase. The situation in this period requires of some specific efforts to conclude the emergency response and establishing specific response plans to begin the recovery/long-term rehabilitation of the affected areas, supporting the return to normal social and economic activity, as far as possible.
Two sessions were envisaged: the first, as a scenario-based facilitated discussion, to demonstrate the development of action strategies in both agricultural and urban scenarios, and the second, to present the set of guidelines and recommendations elaborated in WP4 to improve the decision making process during the transition phase.
3.4.1 WP4 scenario-based facilitated discussion
The intervention scenario in the transition phase was based on these main assumptions:
-
the release has ceased, the control over the source has been taken and urgent protective measures have been implemented to avoid the exposure to population, including evacuation, access restrictions and food restrictions;
-
the radioactive contamination has spread in the surroundings of the damaged nuclear power plant and transported and dispersed through near regions, affecting both inhabited areas and relevant agricultural and farming systems;
-
the contamination level range and the affected areas have been identified;
-
it has to be decided how to proceed in such a situation. The actions to be taken will be focused on mitigating the consequences of the contamination and on preparing recovery plans on the urban and agricultural areas and the food-chain system affected.
For the purposes of this session, one member of one ensemble from WP1 was assumed to be the “real” deposition pattern. Only the 137Cs contamination was considered.
The main question for discussion was: “How to plan the establishment of optimal remediation strategies with stakeholder involvement in the decision-making process?”, and the focus in discussions was made on: Involvement of the stakeholders in the decision-making process, and the decision criteria and actions taken in the transition phase.
First, the introduction to the state of the scenario in the transition phase was presented to the audience. Figure 23 shows the information provided to participants on the radiological situation, including zoning maps according to the ground contamination level of 137Cs and according to the dose prognostic at both short (after the total deposition), and long-term (one year after the deposition). These maps illustrate the areas affected, the magnitude of the radiological impact and the preventive actions to take on each one, in case no other action is implemented. In the other way, the Figure 20, also present a summary of the environmental characterisation, according to the land use zoning, in order to identify the populated (urban) and productive areas of concern.
In summary, the scenario has some zones with an emergency exposure situation, where if the total effective dose projected to 1y (TED1y) ≥100 mSv, a permanent relocation is mandatory; and if TED1y is among 20 mSv and 100 mSv, some type of restriction of use would be implemented. In these zones, actions trying to reduce the TED1y to ≤20 mSv should be planned and implemented in order to look at the conclusion of the emergency phase. Other zones will be under an existing exposure situation because the TED1y is situated among 1 mSv and >20 mSv. Here, optimised strategies should be planned to recover the living conditions as soon as possible.
For purposes of the demonstration, areas in the zone heavily contaminated have been selected: An urban area situated in the most populated zone and with a TED1y ≈ 20 mSv and an agricultural system situated in the meadow areas at the North of this zone, in Zuid-Holland.
For each environmental scenario, background information, maps and graphs to deal with the consequence management and preparedness for the recovery were presented to the audience. Following, the urban and agricultural scenarios are presented in detail.
Fig. 20 Information on the radiological and environmental situation of the affected areas by the accidental deposition of 137Cs. |
Urban scenario
The urban area of concern was the municipality of Cromstrijen, at the edge of the 20 mSv.y−1 zone. Figure 21 shows the location of this municipality and its main characteristics, population, surface areas and the predominately built environment.
As consequence of the deposition of 137Cs, there are different contaminated surfaces: roofs, walls, streets, pavements, gardens as other areas of grass, playing grounds, sports fields, interiors, and so on. The contamination average is around 1 MBq m−2 for 137Cs and the doses range 20 mSv y−1. A set of options for recovery strategy development were agreed to be following as it is shown in Figure 22.
The consequences for health (projected residual doses in Numansdorp, mean individual dose 1st year due the recovery strategies, number of cancer incidents during 50 years attributed to the exposure (population and workers)), costs and waste were estimated and evaluated from the values used in the WP4 Dutch panel1 (van Asselt et al., 2019) and using the approaches developed in the WP4 task 4.1 (Charnock et al., 2020). The results were shared with the audience as a starting point of the discussions (some examples are shown in Fig. 23). A table summarising the quantifiable consequences of clean-up was also provided.
It was pointed out that also other factors, which are more difficult to quantify, should be also taken into account to assess the success of the strategies. The biggest uncertainty was assumed to be probably in how much the consequences of the accident in other regions will impact on this town, i.e. disruption to supply chains, employment availability and customer demand. Among other factors could be psychosocial consequences, prevent anxiety, acceptance of the protective actions and recovery strategy, perception of the risk for the consumer, protection of export, independence population, trust on the authorities and other.
Fig. 21 The urban area of concern. |
Fig. 22 Options for recovery (strategies) in the urban area. |
Fig. 23 Information on the consequences of implementing different recovery strategies in the urban areas in terms of the temporal evolution of the residual doses, mean annual doses (1st year) and costs of the strategies. |
Agricultural scenario
For the agricultural scenario, the affected areas were characterized as it is given in Figure 24.
Contamination and transfer to soils, crops and food-chain (products), estimated using the modules of JRODOS (Raskob et al., 2011) have been presented and discussed under the scenario in Zuid-Holland. In this area, the contamination ranges among 1 to 10 MBq m−2 for 137Cs. There are some products with activity concentration above the maximum permitted level (MPL) for commercialisation (i.e. ≥5000 Bq kg−1 in grass; ≥1000 Bq kg−1 in milk). The temporal evolution of the activity concentration of 137Cs in agricultural products presented to participants and taken into account in discussions is given in Figure 25.
A set of recovery alternatives was selected from the EURANOS handbooks (Nisbet et al., 2010) for discussion and is presented in Figure 26.
The WP3 outputs on recovery actions in the soil as it is presented in Figure 27 have been used as an input for discussions.
Additionally, to the uncertainties presented above due to parameterisation or modelling of the alternatives of recovery (Charnock et al., 2020), there are other uncertainties, inherent to the decision making process, that rise when planning the implementation of a recovery strategy. A summary of the main uncertainties, identified from the WP4 stakeholders’ panels (Montero et al., 2020) was presented to facilitate the discussions in the working groups as follows from Figure 28.
Fig. 24 Agricultural areas of concern. |
Fig. 25 Temporal evolution of the activity concentration of 137Cs in agricultural products: Zoning according to the MPLs [Bq kg−1]. |
Fig. 26 Recovery alternatives in the agricultural area of concern. |
Fig. 27 Recovery actions in soil. |
Fig. 28 Uncertainties raised in the planning of the recovery strategies in an agricultural environment. |
3.4.1.1 Feedback from WP4 scenario-based discussions
For better organisation of the discussions, individual groups of 10 people, around a table, were distributed into two parts. Each one was devoted to discuss the issues of one of the two scenarios. The discussions on both scenarios have been driven by a common questionnaire distributed to each group of participants which was split into the following topical questions:
-
Q1. Which are the main concerns when facing the recovery strategy?
-
Q2. What are the objectives to pursue in the recovery strategy?
-
Q3. What are the main factors and key criteria for the strategy selection?
-
Q4. What are the main uncertainties affecting the decision about the recovery strategy?
-
Q5. Choose the strategy you think it is best according to the previous discussions.
Each question included suggested answers and provided a possibility to complete other suggestions discussed within the working group. Participants indicated the preferences of the main concerns when facing the recovery strategy so it was possible to estimate the most frequent concern. The questionnaire provided the possibility to scale relative importance of the proposed objectives to pursue in the recovery strategy, main factors and key criteria for the strategy selection within the scale from 1– not important to 7– very important. The main uncertainties have been identified within the categories such as governance, environment, human health and safety, social, economy and transversal issues. Based on the discussions some working groups agreed on the strategy they thought is the best.
The questionnaires have been collected and answers from each working group evaluated and provided as an input for the further discussion and demonstration of the WP6 outputs (Sect. 3.6). Positive feedback was obtained from the participants who highlighted the usefulness of using scenario-based analysis to engage different stakeholders in the post-accidental decision-making process and to promote discussions where all actors can give their views and preferences on the recovery alternatives. Participants also highlighted the necessity of to provide accurate and understandable information, prepared and focussed to the objectives of the decisions, in order to have a better knowledge on the actual reality and the possible futures helping the decision-making on the recovery actions.
3.4.2 Guidelines and recommendations for decision making during the transition phase
The presentations and follow-up scenario-based facilitated discussions in the area of the development of countermeasure strategies involving stakeholders were completed with a poster session focusing on the involvement of stakeholders in decisions to recover acceptable living conditions. The posters have presented and discussed the objectives, materials and methods, results and conclusions of the stakeholder engagement through scenario-based discussion panels in Belgium, France, Greece, Ireland, The Netherlands, Norway, Portugal, Slovak Republic and Spain.
Based on the cross-country comparison of the findings and conclusions of the national panels the recommendation associated with different category of uncertainties (governance, environment, human health and safety, social, economy and transversal issues) have been presented as it is given in Figure 29 and discussed in the working groups under the category of uncertainty.
Each recommendation has been thoroughly discussed within the working group with the focus on why this recommendation is suggested and the way how it could be fulfilled with the indication of the different stakeholders who can contribute to its fulfilment.
Fig. 29 Recommendations for each category of uncertainties. |
3.4.2.1 Key feedback from WP4 discussion on guidelines and recommendations
The next questions were proposed to participants’ groups to facilitate the discussions:
-
Do you agree with this recommendation?
-
Is there anything missing?
-
What should be improved or better explained?
The participants expressed their views and suggestions to improve this first set of recommendations. Working groups’ leaders collected these comments, which have been considered to finalize the recommendations presented in more details in Durand et al. (2020).
3.5 Social, ethical and communicational aspects of uncertainty management (WP5)
CONFIDENCE work package 5 addressed social uncertainties faced by stakeholders including wider publics. The objectives were to identify societal uncertainties in emergency and post-accident situations, highlight the ethical implications of uncertainty management, investigate citizens’ and emergency actors’ sense-making of uncertainties, and subsequent decisions, develop improved communication of uncertainties and provide advice for improving emergency preparedness, response and recovery. The WP5 scenario-based facilitated discussion focused on two key communication challenges, one in the early phase, the other in the transition phase:
-
communicating about the intake of iodine tablets;
-
communicating about food safety.
Participants to the dissemination workshop were divided in groups, each group addressing one of these two topics. Participants were also referred to the communication recommendations formulated within CONFIDENCE WP5 (Perko et al., 2020).
For iodine tables, social uncertainties mentioned in the task introduction included lack of knowledge about the correct use (example given in Fig. 30) and the protective role of iodine tablets among the residents living close to nuclear installations, potential non-compliance with official advice, people not having iodine tablets at home, and people not being informed about what to do in case of accident (Turcanu et al., 2020).
The task was formulated as follows:
-
Borssele scenario; 21:00, possible release within 12 hours. Population: 300,000;
-
What are the most important things to communicate?
-
How to do that using a text message (SMS*) for people currently located in the potential area for stable iodine intake?
The exercise proved complex but was appreciated by the participants as an opportunity to reflect on social and ethical issues, as well as practical challenges in preparing for stable iodine intake. Groups pointed out that communication would differ according to the existing level of iodine tablet distribution, and that there would be particular challenges with how to distribute the stable iodine tablets in an effective way for those who do not have tablets (e.g. tourists in the area, queues at pharmacies). Potential problems with different intervention levels between Belgium and the Netherlands were noted, and authorities would need to be prepared for reactions on social media and potential rumours. The technical challenges of sending SMS messages (number of characters, how to distribute, who is likely to be excluded) were discussed as well as how the time and day would impact on the message (Sunday evening or Monday morning), draft texts from all groups identified the need to provide links to credible sources.
For the task related to food safety, the social uncertainties introduced at the onset of the task included the potential reluctance to consume products with residual radioactivity, the different interpretations of risk by different actors, the potential for stigmatisation of affected areas, the support needed by local actors (example is given in Fig. 31).
The task for participants working in this group was formulated as follows:
-
“All milk from the Zeeland area on the market is below MPL’s”;
-
How would you communicate this to the public to avoid a boycott in the Netherlands and abroad?
-
Identify challenges.
-
What are the most important messages to convey?
-
How would you communicate this?
Participants recognised again the complexity of this task. Explaining that milk containing radioactivity is below MPL’s is challenging, particularly since the word “contaminated” has a negative connotation. The exact message would depend on whether some milk in the Zeeland region, or neighbouring regions, were above MPLs, or whether all milk in Zeeland was below MPLs. The question was raised as to what constitutes a “safe” level of radioactivity in milk. Participants agreed that communicating that a product is safe for consumption is essential, but could not agree whether the milk discussed in this scenario is safe or not (i.e., whether or not milk in Zeeland would actually be below MPLs). Information on monitoring strategies would be likely to play an important role in consumer trust as well as who was giving the message. Concerns were also raised regarding breastfeeding for babies.
Fig. 30 Example of societal uncertainties regarding the timing of stable iodine intake. |
Fig. 31 Example of uncertainties related to food consumption. |
3.5.1 Feedback from WP5 scenario-based discussions
Key feedback from both discussions was that this type of communication is complex and challenging, and that preparation before an incident is essential.
3.6 Decision making under uncertainties (WP6)
The task of MCDA scenario-based facilitated discussion focused on the urban decontamination of the municipality Cromstrijen/Numansdorp based on the outputs of WP4 scenario-based discussions using the method of the facilitated scenario-based discussion in combination with the MCDA tool.
Five different countermeasure strategies have been discussed:
-
no actions, only monitoring;
-
low waste strategy;
-
high waste strategy;
-
low waste + relocation;
-
high waste + relocation.
The strategy developments itself as well as main concerns when facing the recovery strategy, objectives to pursue in the recovery strategy, main factors and key criteria for the strategy selection and main uncertainties affecting the decision about recovery strategy have been discussed by all participants in groups within the previous work of WP4. Each group filled the questionnaire. The results were collected and analysed for the purpose of the MCDA scenario-based facilitated discussion.
The summary of conclusions of the outputs of the WP4 scenario-based discussions has been presented to all participants before the MCDA scenario-based facilitated discussion.
It was agreed, that main concerns are:
-
social impacts;
-
health impacts;
-
feasibility;
-
environmental + economical and other issues.
The main objectives of the recovery plan are:
-
minimise the impact on the population;
-
minimise the radiological impact;
-
improve the public confidence.
The discussions have started with following inputs:
- Goal: minimise impact in the population;
- Key criteria/attributes:
-
social impacts: community involvement and community acceptance,
-
health impacts: psychological consequences and avoidance of doses,
-
feasibility: duration and workforce,
-
environmental: waste production and waste disposal,
-
economic: employment − human capital.
- Uncertainties:
-
What to do with wastes? → waste production → waste amount − (H),
-
How to engage the community? → community involvement → willingness of population to cooperate on strategy implementation − (S),
-
duration of the countermeasures implementation → dependent on workforce → number of workers needed − (H),
-
data concerning the number of cancers → avoid doses → doses − (H),
-
roles and decisions: local versus regional and national authorities → community involvement → Willingness of population to cooperate on strategy implementation − (S).
A selected group of 4 stakeholders who played a role of decision makers have acted as Crisis Centre at a stage and were observed and supported by the remaining participants of the workshop.
Discussion among the remaining participants in small groups was encouraged. The crisis manager with the role “mayor” called in additional advisors to support her in the official discussion, thus forming a second group and providing in one voice their decisions. The discussions were facilitated by experienced independent facilitators. The MCDA tool was overhead presented during the ongoing discussion. The criteria weights and values were displayed during the discussion while the resulting ranking of strategies was initially hidden.
The values for the “hard” (H) criteria such as waste amount, number of workers needed and doses have been taken directly from the JRODOS calculation results. The values for the “soft” (S) criterion as “Willingness of population to cooperate on strategy implementation” were estimated and agreed by the team of decision makers with support from other participants.
The thorough discussion in all groups took place during the estimation and agreement on the weights of the criteria. At that stage of discussion, facilitators helped to interactively observe and evaluate the changes in criteria or weights using the MCDA tool. The different opinions on the weights were investigated in the MCDA tool and then consolidated into one common agreement.
Having agreed on the initial weights for particular criteria they have been assessed to those using the MCDA tool. The resulting order of the strategies was uncovered and displayed to participants after the first iteration using the bar type of visualisation as it is presented in the Figure 32. Each criterion contributed with its weight to the final ranking of recovery strategies.
The stability of current ranking was discussed using the visualisation in the MCDA tool.
An analysis tool of the MCDA provided a chart which graphically displayed what would happen if a specific weight of a criterion was to be changed, respectively if it could not be determined accurately (Fig. 33). Crossing lines indicate a change in ranking, while no crossings within a wide range of the weight indicate stability even against uncertainty. This was understood and valued by the decision makers. From this, they also concluded that ranking positions with close values should not be considered absolute but treated as equally possible.
Fig. 32 Weights of criteria and strategies order visualisation. |
Fig. 33 Stability analysis for weight of criterion “Amount of waste”. |
3.6.1 Feedback from WP6 scenario-based discussions
The MCDA tool was evaluated to be very helpful for decision makers as it helps a clear structuring of the important facts influencing the choice of an appropriate strategy. Additionally, it triggered interesting discussions on criteria meanings e.g. what “protect the health of the public” actually meant under these conditions, which helped the groups to better understand each other’s motivation. It was definitely recognized by participants that the tool has the supportive character and the results could not be directly taken without deeper understanding and analysis of the actual outcome. Political decisions as one of the factors influencing the decision was pointed out and experienced in the discussion transparently. It was also pointed out whether criteria should be independent from each other or not, as in real life many decision criteria are linked e.g. by costs. Therefore it is very difficult to determine independent criteria for decision making. This stressed even more the need for awareness that the advised best strategy should not be executed blindly but regarded in respect to the determining criteria with their dependencies and uncertainties.
3.7 Round table discussions
The round table and panel discussions formed a valuable part of the CONFIDENCE dissemination workshop and focused on:
-
achievements and way forward based on the research results and outputs of each CONFIDENCE work package;
-
feedback from end users, represented by participants from IAEA, SURO (Czech Republic), PHE (UK), STUK (Finland) and APA (Portugal), on outputs and remaining research requirements or improvements in models/guidance;
-
Strategic Research Agendas and CONCERT Joint Road Map in view of CONFIDENCE results presented by members of the NERIS, ALLIANCE, EURADOS and SHARE research platforms and the CONCERT EJP coordinator;
-
further development and conclusions presented by CONFIDENCE project coordinator, IAEA and ICRP (Committee 4) representatives and the CONCERT EJP coordinator.
The key feedback is discussed in Raskob et al. (2020).
4 Conclusions
The CONFIDENCE dissemination workshop was interactive and dynamic. It provided a floor for education activities in a form of presentations and poster sessions, training using the scenario-based activities and table-top exercises in a form of scenario-based facilitated discussions. The wide dissemination of results was done in an understandable way connected directly to demonstration and practical use. Thorough presentations were backed up by posters with more details and a poster session giving possibilities for attendees to discuss the poster/CONFIDENCE with the authors. Scenario-based facilitated discussions provided the opportunity for round table group working so that all participants were actively involved and expressed their views, experiences, were able to raise questions and receive answers. Round table discussions as well as panel discussions enable feedback from participants. The sharing of knowledge and experiences among generations of scientists, researchers and experts took place in a very open and effective way creating connections for future research and development in the area of modelling and decision making in nuclear emergencies.
Acknowledgement
The work described in this paper was conducted within the CONFIDENCE project, which was part of the CONCERT project. This project has received funding from the Euratom research and training programme 2014–2018 under grant agreement No. 662287.
Disclaimer (Art. 29.5 GA). This publication reflects only the author’s view. Responsibility for the information and views expressed therein lies entirely with the authors. The European Commission is not responsible for any use that may be made of the information it contains.
References
- Beresford NA, Barnett CL, Chaplow J, Lofts S, Wells C, Brown JE, Hosseini A, Thørring H, Almahayni T, Sweeck L, Guillén J, Lind O-C, Oughton DH, Salbu B, Teien H-C, Perez-Sánchez D, Real A. 2020. CONFIDENCE overview of improvements in radioecological human food chain models and future needs. Radioprotection 55(HS1). https://doi.org/10.1051/radiopro/2020019. [Google Scholar]
- Brown JE, Avila R, Barnett CL, Beresford NA, Hosseini A, Lind O-C, Oughton DH, Perez D, Salbu B, Teien HC, Thørring H. 2019. Improving models and learning from post-Fukushima studies. CONCERT deliverable D9.13. Available from: https://www.concert-h2020.eu/en/Publications. [Google Scholar]
- Brown JE, Beresford NA, Hosseini A, Barnett CL. 2020. Applying process-based models to the Borssele scenario. Radioprotection 55(HS1). https://doi.org/10.1051/radiopro/2020020. [Google Scholar]
- Charnock T, Andersson K, Trueba C, Montero M. 2020. Uncertainties confronting stakeholders and decision-makers in planning intervention in urban and agricultural scenarios. Radioprotection 55(HS1). https://doi.org/10.1051/radiopro/2020021. [Google Scholar]
- Durand V, Maître M, Croüail P, Schneider T, Sala R, Marques-Nunes P, Paiva I, Monteiro Gil O, Reis M, Hilliard C, Tafili V, Twenhöfel C, van Asselt E, Trueba C, Montero M, Duranova T. 2020. Towards an improved decision-making process to better cope with uncertainties following a nuclear accident. Radioprotection 55(HS1). https://doi.org/10.1051/radiopro/2020023. [Google Scholar]
- Duranova T, Beresford NA, Perko T, Raskob W. 2020. Education and training activities in the Euratom CONFIDENCE project. Radioprotection 55(HS1). https://doi.org/10.1051/radiopro/2020011. [Google Scholar]
- Geertsema G, de Vries H, Sheele R. 2019. High resolution meteorological ensemble data for CONFIDENCE research on uncertainties in atmospheric dispersion in the (pre-)release phase of a nuclear accident. In: 19th International Conference on Harmonisation within Atmospheric Dispersion Modelling for Regulatory Purposes, 3–6 June, Bruges, Belgium. [Google Scholar]
- Hamburger T, Gering F, Ievdin I, Schantz S, Geertsema G, de Vries H. 2020. Uncertainty propagation from ensemble dispersion simulations through a terrestrial food chain and dose model. Radioprotection 55(HS1). https://doi.org/10.1051/radiopro/2020014. [Google Scholar]
- Korsakissok I, Périllat R, Andronopoulos S, Bedwell P, Berge E, Charnock T, Geertsema G, Gering F, Hamburger T, Klein H, Leadbetter S, Lind OC, Pázmándi T, Rudas C, Salbu B, Sogachev A, Syed N, Tomas J, Ulimoen M, de Vries H, Wellings J. 2020. Uncertainty propagation in atmospheric dispersion models for radiological emergencies in the pre- and early release phase: summary of case studies. Radioprotection 55(HS1). https://doi.org/10.1051/radiopro/2020013. [Google Scholar]
- Montero M, Sala R, Trueba C, García-Puerta B, Abelshausen B, Bohunova J, Croüail P, Durand V, Duranova T, Hilliard C, Maître M, Mitrakos M, Monteiro Gil O, Nunes P, Paiva I, Reis M, Schneider T, Skuterud L, Smith V, Tafili V, Thørring H, Turcanu C, Twenhöfel C, van Asselt E. 2020. Stakeholder involvement through national panels and surveys to address the issues and uncertainties arising in the preparedness and management of the transition phase. Radioprotection 55(HS1). https://doi.org/10.1051/radiopro/2020022. [Google Scholar]
- Nisbet AF, Brown J, Howard BJ, Beresford NA, Ollagnon H, Turcanu C, Camps J, Andersson K, Rantavaara A, Ikäheimonen T, Duranova T, Oughton D, Kirchner G, Papachristodoulou C, Ioannides K, Kwakman P. 2010. Decision aiding handbooks for managing contaminated food production systems, drinking water and inhabited areas in Europe. Radioprotection 45(5 Suppl.): S23–S37. [CrossRef] [EDP Sciences] [Google Scholar]
- Perko T, Benighaus L, Tomkiv Y, Wolf HV. 2020. Guidance on communicating about uncertainties in nuclear emergency management. Radioprotection 55(HS1). https://doi.org/10.1051/radiopro/2020028. [Google Scholar]
- Raskob W, Trybushnyi D, Ievdin I, Zheleznyak M. 2011. JRODOS: platform for improved long-term countermeasures modelling and management. Radioprotection 46(6): S731–S736. https://doi.org/10.1051/radiopro/20116865s. [CrossRef] [EDP Sciences] [Google Scholar]
- Raskob W, Beresford NA, Duranova T, Korsakissok I, Mathieu A, Montero M, Müller T, Turcanu C, Woda C. 2020. CONFIDENCE: achievements and way forward. Radioprotection 55(HS1). https://doi.org/10.1051/radiopro/2020010. [Google Scholar]
- Turcanu C, Perko T, Sala R, Wolf HV, Camps J, Oughton D. 2020. Social uncertainties related to stable iodine intake in a nuclear emergency. Radioprotection 55(HS1). https://doi.org/10.1051/radiopro/2020027. [Google Scholar]
- van Asselt E, Twenhöfel C, Smetsers R. 2019. Stakeholder engagement through scenario-based discussion panels. Part B-05. Report of the Dutch National Panel. CONCERT deliverable D9.22. Available from: https://www.concert-h2020.eu/en/Publications. [Google Scholar]
- Walsh L, Ulanowski A, Kaiser JC, Woda C, Raskob W. 2019. Risk bases can complement dose bases for implementing and optimizing a radiological protection strategy in urgent and transition emergency phases. Radiat. Environ. Biophys. 58: 539–552. [CrossRef] [PubMed] [Google Scholar]
- Walsh L, Ulanowski A, Kaiser JC, Woda C, Raskob W. 2020. A new European cancer risk assessment tool for application after nuclear accidents. Radioprotection 55(HS1). https://doi.org/10.1051/radiopro/2020018. [Google Scholar]
- Woda C, Walsh L, Kaiser JC, Ulanowski A, Hamburger T, Gering F, Duranova T, Raskob W. In preparation. Cancer risk assessment for supporting decision making in the early phase of a nuclear accident − results of the scenario-based workshop of CONFIDENCE. [Google Scholar]
Cite this article as: Duranova T, Bedwell P, Beresford NA, Bleher M, Gering F, Geertsema G, Hamburger T, Kaiser JC, Korsakissok I, Leadbetter SJ, Montero M, Müller T, Oughton D, Perko T, Raskob W, Tomas J, Turcanu C, de Vries H, Walsh L, Woda C. 2020. CONFIDENCE dissemination meeting: Summary on the scenario-based workshop. Radioprotection 55(HS1): S17–S37
All Figures
Fig. 1 Location of the hypothetical scenario. |
|
In the text |
Fig. 2 Source term of the hypothetical scenario and its position on the INES scale (International Nuclear and Radiological Event Scale) compared to the Chernobyl and Fukushima accidents. |
|
In the text |
Fig. 3 Wind speed and direction at the source location, forecast by the ensemble members at 10 m (black) and 250 m (gray) above ground. The x-axis shows the number of hours after beginning of meteorological forecast, “Now” is the time when the decision making takes place during the first stage. The “potential release time” is at 21:00 UTC ±6 hours (dark rectangle). |
|
In the text |
Fig. 4 Indicative 6-hour plume trajectories based on analysed weather as a function of height (between 10 m and 500 m), for a release on 12/07/17 at 12:00, 18:00 UTC, and 13/07/17 at 00:00 UTC and rain (cumulated in one hour). Trajectories plotted by KNMI. |
|
In the text |
Fig. 5 Stage 1 of WP1 discussions. Estimated time to release − 24 hours. Uncertainty in the release time: ±6 hours. |
|
In the text |
Fig. 6 Questions asked to the audience during stage 1 of WP1 discussions. |
|
In the text |
Fig. 7 Prognostic frequency map for areas above the threshold value for evacuation (left) and sheltering (right), considering an uncertainty in the release time of ±6 hours. The value 0 corresponds to areas where no simulation forecast a threshold exceedance, and 1 (red (black in B&W printed version)) implies that all simulations considered predict a value above the threshold. |
|
In the text |
Fig. 8 Maps of effective dose for (a) the “least severe” and (b) the “worst case” scenarios in terms of population affected by the threshold exceedance. The first item in the legend (red colour) corresponds to evacuation and the second item in legend (orange colour) to sheltering criterion. |
|
In the text |
Fig. 9 Stage 2 of WP1 discussions. Estimated time to release − 12 hours. No uncertainty in the release time. |
|
In the text |
Fig. 10 Questions for WP1 discussion for stage 2–evacuation and sheltering. |
|
In the text |
Fig. 11 Questions for WP1 discussion for the stage 2–food restriction. |
|
In the text |
Fig. 12 Comparison of prognostic frequency maps for areas above the threshold value for evacuation: stage 1 with uncertainty in release time (left) and stage 2 without uncertainty in release time (right). |
|
In the text |
Fig. 13 Frequency maps for effective dose >10 mSv (top panels) and iodine in milk >500 Bq/kg (bottom panels), without (left) and with (right) data assimilation. |
|
In the text |
Fig. 14 Updated combination of model results and monitoring data: additional information from mobile dose rate monitoring in indicated area (gray or orange line) needed for decision on sheltering and relocation. |
|
In the text |
Fig. 15 Updated combination of model results and monitoring data; additional information from mobile monitoring needed for decision on sheltering in urban hot spot region. |
|
In the text |
Fig. 16 Area for demonstration of process-based modelling. |
|
In the text |
Fig. 17 Deposition map for 90Sr (Bq m−2) used in the assessment. Note: the values are reported as natural logarithm, ln(deposition). Each cell covers an area of 1 km2 (from Brown et al., 2020). |
|
In the text |
Fig. 18 Soil property data and soil map showing the grid of spatial soil categorisations (C: clay; SL: sandy loam; SSL: sandy silty loam; LS: loamy sand; O: organic) as used in the assessment (note this has been fabricated for demonstration purposes; from Brown et al., 2020). Cell size equates to 1 km2. |
|
In the text |
Fig. 19 Predictions of 137Cs activity concentrations in milk using a process-based soil–plant model for the different soils types; for comparison predictions using FDMT are also given. Top: predictions over 27 years; bottom: predictions over the first 90 d after deposition. Note: an expanded and refined application of the Sr and Cs soil–plant process-based models to the Borsselle scenario is presented and discussed in Brown et al. (2020). |
|
In the text |
Fig. 20 Information on the radiological and environmental situation of the affected areas by the accidental deposition of 137Cs. |
|
In the text |
Fig. 21 The urban area of concern. |
|
In the text |
Fig. 22 Options for recovery (strategies) in the urban area. |
|
In the text |
Fig. 23 Information on the consequences of implementing different recovery strategies in the urban areas in terms of the temporal evolution of the residual doses, mean annual doses (1st year) and costs of the strategies. |
|
In the text |
Fig. 24 Agricultural areas of concern. |
|
In the text |
Fig. 25 Temporal evolution of the activity concentration of 137Cs in agricultural products: Zoning according to the MPLs [Bq kg−1]. |
|
In the text |
Fig. 26 Recovery alternatives in the agricultural area of concern. |
|
In the text |
Fig. 27 Recovery actions in soil. |
|
In the text |
Fig. 28 Uncertainties raised in the planning of the recovery strategies in an agricultural environment. |
|
In the text |
Fig. 29 Recommendations for each category of uncertainties. |
|
In the text |
Fig. 30 Example of societal uncertainties regarding the timing of stable iodine intake. |
|
In the text |
Fig. 31 Example of uncertainties related to food consumption. |
|
In the text |
Fig. 32 Weights of criteria and strategies order visualisation. |
|
In the text |
Fig. 33 Stability analysis for weight of criterion “Amount of waste”. |
|
In the text |
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.