Issue |
Radioprotection
Volume 44, Number 5, 2009
ECORAD 2008 - Radioecology and Environmental Radioactivity
|
|
---|---|---|
Page(s) | 777 - 784 | |
DOI | https://doi.org/10.1051/radiopro/20095140 | |
Published online | 06 June 2009 |
Inter-calibration of gamma dose rate detectors on the European scale
1
Bundesamt für Strahlenschutz, Freiburg, Germany
2
Institute of Environmental Geosciences, University of Basel, Basel, Switzerland
A project to compare the response of different detector types was started in 1996 at the Schauinsland mountain (1200 m above sea level) close to Freiburg, Germany, where the German office for radiation protection (BfS) runs a trace analysis laboratory since about 50 years. The aim of this inter-calibration experiment is to compare different gamma dose rate detector types over long periods and under rather unfavorable climatic conditions. This allows to characterise different probe types under environmental conditions and it complements the EURADOS inter-comparison exercises, which a carried out every 2 to 3 years. Both projects dealing with the harmonization of gamma dose rate data in the EU are used to derive terrestrial dose rate from the raw data. Using interpolation techniques provided by INTAMAP seasonal maps of the terrestrial dose rate could be generated. It is shown, that this information can be used for the calibration of satellite based soil moisture methods as well for the calculation of radon emission maps on the European scale, which are of interest for the research community, since Radon is used as a passive tracer in atmospheric research to examine transport processes on synoptic time scales.
© EDP Sciences, 2009
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.