Accès gratuit
Numéro
Radioprotection
Volume 44, Numéro 5, 2009
ECORAD 2008 - Radioecology and Environmental Radioactivity
Page(s) 589 - 594
DOI https://doi.org/10.1051/radiopro/20095109
Publié en ligne 6 juin 2009
  • Oughton, D.H., Ethics, philosophy and environmental protection in the Arctic: A case study on harmonisation of chemical and radioactive pollutant management. In: Environmental Radioactivity in the Arctic and Antarctic, (editors, P. Strand, T. Jolle, Å. Sand), Published by: NRPA: Østerås. ISBN 82-90362-13-7. (2002) pp. 31–34. [Google Scholar]
  • Sazykina, T.G., Radiation Protection Dosimetry, 75 (1998), 219–222. [Google Scholar]
  • Sazykina, T.G., Jaworska, A. and Brown, J.E. (Eds.). A Deliverable Report (D5) of the EPIC project (Contract no. ICA2-CT-200-10032). (2003) pp. 119. [Google Scholar]
  • AMAP, Assessment Report: Arctic Pollution Issues, Oslo (1998) pp. 859. [Google Scholar]
  • Larsson, C-M., J. Radiol. Prot., 24 (2004), pp. A1–A13. [Google Scholar]
  • Brown, J.E., Thørring, H. and Hosseini, A., A Deliverable Report (D6) of the EPIC project (Contract no. ICA2-CT-200-10032). (2003) pp. 175. [Google Scholar]
  • Beresford, N., Brown, J., Copplestone, D., Garnier-Laplace, J., Howard, B., Larsson, C-M., Oughton, D., Pröhl, G and Zinger. I., D ERICA: A Deliverable Report for the Project ERICA (Contract No. FI6R-CT-2004-508847) (2007) pp. 82. [Google Scholar]
  • IAEA, TECDOC-1270. International Atomic Energy Agency, Vienna (2002) pp. 36. [Google Scholar]
  • Hosseini A., Thørring H., Brown, J.E., Saxén R. and Ilus, E. J. Env. Rad. (in press) (2008). [Google Scholar]
  • Beresford, N.A., Barnett, C.L., Howard, B.J., Scott, A., Brown, J. and Copplestone, D. J. Env. Rad. (in press) (2008). [Google Scholar]
  • Beresford, N.A., Wright, S.M., Brown, J.E. and Sazykina, T. (Eds.). A Deliverable Report (D3) for the EPIC project (EC Inco-Copernicus project ICA2-CT-2000-10032) (2003) pp. 75. [Google Scholar]
  • Brown, J.E., Børretzen, P., Dowdall, M., Sazykina, T. and Kryshev, I., Marine Biota Arctic, 57 (No.3) (2004) pp. 279–289. [Google Scholar]
  • Golikov, V. and Brown, J.E. (Eds.). A Deliverable Report (D4) for the EPIC project (EC Inco-Copernicus project ICA2-CT-2000-10032) (2003) pp. 52. [Google Scholar]
  • Brown, J.E., Alfonso, B., Avila, R., Beresford, N.A., Copplestone, D., Pröhl, G. and Ulanovsky, A. J. Env. Rad. (in press) (2008). [Google Scholar]
  • Pentreath, R. J., J. Radiol. Prot., 22 (2002) 45–56. [Google Scholar]
  • ICRP, Annals of the ICRP 91 (2003) 201–266. [Google Scholar]
  • Beresford, N.A., Barnett, C.L., Jones, D., Wood, M., Appleton, D., Breward, N. and Copplestone, D.C., J. Env. Rad. (in press) (2008). [Google Scholar]
  • Copplestone, D., Hingston, J. and Real, A. J. Env. Rad. (in press) (2008). [Google Scholar]
  • Zinger I., (Ed.). A Deliverable Report (D8) for the Project ERICA (Contract No. FI6R-CT-2004-508847) (2007) pp. 127. [Google Scholar]
  • USDOE (2002).Technical Standard DOE-STD-1153-2002. U.S. Department of Energy, Washington D.C. [Google Scholar]

Les statistiques affichées correspondent au cumul d'une part des vues des résumés de l'article et d'autre part des vues et téléchargements de l'article plein-texte (PDF, Full-HTML, ePub... selon les formats disponibles) sur la platefome Vision4Press.

Les statistiques sont disponibles avec un délai de 48 à 96 heures et sont mises à jour quotidiennement en semaine.

Le chargement des statistiques peut être long.