Coping with uncertainties for improved modelling and decision making in nuclear emergencies. Key results of the CONFIDENCE European research project
|
|
---|---|---|
Page(s) | S17 - S37 | |
Section | COPING WITH UNCERTAINTIES FOR IMPROVED MODELLING AND DECISION MAKING IN NUCLEAR EMERGENCIES | |
DOI | https://doi.org/10.1051/radiopro/2020009 | |
Publié en ligne | 26 juin 2020 |
Article
CONFIDENCE dissemination meeting: Summary on the scenario-based workshop
1
VUJE – VUJE, a.s.,
Trnava, Slovak Republic
2
PHE – Public Health England, Centre for Radiation, Chemical and Environmental Hazards,
Didcot, UK
3
CEH – UK Centre for Ecology & Hydrology,
Lancaster, UK
4
BfS − Federal Office for Radiation Protection,
Neuherberg, Germany
5
KNMI – Royal Netherlands Meteorological Institute,
Utrechtseweg, The Netherlands
6
HMGU – Helmholtz Zentrum München–German Research Center for Environmental Health,
Neuherberg, Germany
7
IRSN – Institute for Radioprotection and Nuclear Safety,
Fontenay-aux-Roses, France
8
Met Office,
Exeter, UK
9
CIEMAT – Centro de Investigaciones Energéticas, Medioambientales y Tecnológicas,
Madrid, Spain
10
KIT – Karlsruhe Institute of Technology,
Eggenstein-Leopoldshafen, Germany
11
NMBU/CERAD − Norwegian University of Life Sciences, Centre for Environmental Radioactivity,
Ås, Norway
12
SCK-CEN − Belgian Nuclear Research Centre,
Mol, Belgium
13
RIVM – National Institute for Public Health and the Environment,
Bilthoven, The Netherlands
14
UZ – University of Zürich, Department of Physics, Science Faculty,
Zürich, Switzerland
* Corresponding author: tatiana.duranova@vuje.sk
The CONFIDENCE dissemination workshop “Coping with uncertainties for improved modelling and decision making in nuclear emergencies” was held in December 2–5, 2019 (Bratislava, Slovak Republic). About 90 scientists and decision makers attended the workshop. The dissemination workshop allowed the presentation of the CONFIDENCE project results, demonstration of the applicability of the developed methods and tools in interactive discussion sessions and the collection of feedback from the participants. The results were disseminated not only in the form of presentations and posters but also through interactive workshops where all participants were involved in round table working groups. A fictive accidental release scenario taking place at a nuclear power plant was developed and used by each work package in the workshop to provide the basis for interactive sessions and discussions.
Key words: dissemination of results / interactive scenario-based workshop / uncertainties / decision support / CONFIDENCE
© The Authors, published by EDP Sciences 2020
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (https://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Les statistiques affichées correspondent au cumul d'une part des vues des résumés de l'article et d'autre part des vues et téléchargements de l'article plein-texte (PDF, Full-HTML, ePub... selon les formats disponibles) sur la platefome Vision4Press.
Les statistiques sont disponibles avec un délai de 48 à 96 heures et sont mises à jour quotidiennement en semaine.
Le chargement des statistiques peut être long.