Free Access
Table 2
Description of environmental source terms for Slovakian NPP's (VVER-440/213 unit).
Source term name | STC6-8d | STC10-8d | STC30-8d |
Reactor type | VVER | VVER | VVER |
Initiating event | STATION BLACKOUT– total loss of Alternate Current (AC) power | Break on main circulation line (28 cm2) | Break on the SG primary collector head (14 cm2) |
Description of scenario | Primary circuit depressurization– SAM; Core damaged; Corium in-vessel retention by application of SAM; CONT damaged; |
Core damaged; RPV failure (SAM– reactor cavity flooding not successful) CONT early damaged; |
Primary circuit depressurization– SAM; Core damaged; Corium in-vessel retention by application of SAM; CONT late damaged; |
Begin of release (after end of chain reaction) | 11 h (after 56 h through CONT break; height: 25 m) | 4 h (after 18 h through CONT break; height: 25 m) | 14 h (after 92 h through CONT break; height: 25 m) |
Duration of release | 181 h (136 h through damaged CONT) | 188 h (174 h through damaged CONT) | 178 h (100 h through damaged CONT) |
Total release | |||
131I | 67 PBq | 105 PBq | 3.7 PBq |
137Cs | 12 PBq | 18 PBq | 0.7 PBq |
133Xe | 930 PBq | 2 000 PBq | 6 400 PBq |
Radiological equivalent of 131I activitya | 630 PBq | 920 PBq | 38 PBq |
INES category | 7 | 7 | 6 |
a
Radiological equivalent of the 131I has been calculated according to INES (2009) methodology.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.