Free Access

Table 4

Description of environmental source terms for Spanish NPP with PWR.

Source term name MA-SBO-173
Reactor type PWR
Initiating event STATION BLACKOUT – total loss of AC power
Description of scenario Running out of batteries 24 h after accident initiation – dry out of SG's;
Core damaged;
RPV failure – start of MCCI;
CONT not damaged – depressurization of CONT by filtered venting;
Begin of release (after end of chain reaction) 32 h
Duration of release 48 h (first) + 14 h (filtered venting) + 12 h (last) = 74 h
Total release
   131I 8.6 PBq
   137Cs 1.7 PBq
   133Xe 2 610.0 PBq
Radiological equivalent of 131I activitya 88.7 PBq
INES category 7
a

Radiological equivalent of the 131I has been calculated according to INES (2009) methodology.

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.