Free Access
Issue
Radioprotection
Volume 46, Number 6, 2011
ICRER 2011 – International Conference on Radioecology & Environmental Radioactivity: Environment & Nuclear Renaissance
Page(s) S647 - S651
Section Management and General Considerations
DOI https://doi.org/10.1051/radiopro/20116660s
Published online 09 January 2012
  • Posiva. Safety Case Plan 2008. Posiva Oy, Report2008–05 (2008) 1–88.
  • Eronen, M., Glückert, G., van de Plassche, O., van de Plicht, J. and Rantala, P. Land uplift in the Olkiluoto-Pyhäjärvi area, southwestern Finland, during last 8000 years. Nuclear Waste Commission of Finnish Power Companies, Report YJT 95–17 (1995) 1–26.
  • Kahma, K. Johansson, M. and Boman, H. Meriveden pinnankorkeuden jakauma Loviisan ja Olkiluodon rannikolla seuraavien 30 vuoden aikana (Merentutkimuslaitos, Helsinki, 2001) pp. 1–28.
  • Haapanen, R., Aro, L., Kirkkala, T., Koivunen, S., Lahdenperä, A-M and Paloheimo, A. Potential reference mires and lakes for biosphere assessment of Olkiluoto site. Posiva Oy, Working Report 2010–67 (2010) 1–218.
  • Ikonen, A.T.K., Aro, L. and Leppänen, V. Forecasts of future terrain and vegetation types at Olkiluoto and implications to spatial and temporal aspects of biosphere modelling. Applied Radiation and Isotopes 66 (2008) 1754–1758.
  • Ikonen, A.T.K., Gunia, M. and Helin, J. Terrain and ecosystems development model of Olkiluoto site, version 2009. Posiva Oy, Working Report in preparation (2011).
  • Haapanen, R., Aro, L., Helin, J., Hjerpe, T., Ikonen, A.T.K, Kirkkala, T., Koivunen, S., Lahdenperä A-M., Puhakka, L., Rinne, M. and Salo, T. Olkiluoto Biosphere Description 2009. Posiva Oy, Report 2009–02 (2009) 1–416.

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.